Bandar Baru Salak Tinggi, Sepang

Want the price list and what is still available? Ask us.

ELEV8 Entrepreneurs' Park

A guarded industrial park of semi-detached and cluster factories 14 km from KLIA, launched in April 2026 with Phase 1 reported 80% sold. This is an industrial project, not a home.

Ask us for the price list and availability

Industrial Factories 64 units Phase 1 6,086–9,091 sq ft Built-up

Free · No obligation · Details from the developer's materials, subject to change

Developer

Mitraland Wawasan

Type

Factories

Phase 1 sizes

6,086–9,091 sq ft

Phase 1 units

64

Price

From RM3.9M (press)

Completion

4Q 2028 (target)

The Development

What it is, and what is published.

ELEV8 Entrepreneurs' Park is a 95.6-acre guarded industrial park in Bandar Baru Salak Tinggi, Sepang, by Mitraland Wawasan Development Sdn Bhd, a joint venture of Mitraland Group and Wawasan Group. Phase 1 has 64 semi-detached and cluster factories of 6,086 to 9,091 sq ft with 9 m ceilings. Press reported prices from RM3.9 million for cluster units and RM4.46 million for semi-detached units, with Phase 1 80% sold at the April 2026 launch and completion targeted for the fourth quarter of 2028.

A guarded industrial park of semi-detached and cluster factories 14 km from KLIA. This is an industrial project, not a home. Press reported prices from RM3.9 million.

64Units in Phase 1
6,086Sq ft, smallest
9,091Sq ft, largest
14 kmTo KLIA
Aerial view of rows of semi-detached and cluster factories at ELEV8 Entrepreneurs' Park, developer's render Entrance gateway of ELEV8 Entrepreneurs' Park at sunset with a lorry arriving, developer's render

Facilities

Facilities.

The Address

Location.

Distances are as listed by the developer where given. The full project profile has the compare table and the FAQ.

Good to Know

Frequently asked questions.

What is ELEV8 Entrepreneurs' Park?

ELEV8 is a 95.6-acre guarded industrial park in Bandar Baru Salak Tinggi, Sepang, developed by Mitraland Wawasan Development Sdn Bhd, a joint venture of Mitraland Group and Wawasan Group. It is Mitraland's third Entrepreneurs' Park and is an industrial project, not a residential one.

How much do the factories cost?

The developer's website publishes no price. EdgeProp reported at the 28 April 2026 launch that prices start from RM3.9 million for cluster units and RM4.46 million for semi-detached units. Ask for the current price by unit.

How big are the units?

Phase 1 factories are 6,086 to 9,091 sq ft, according to the press. The split between cluster and semi-detached units is not stated on the pages we read, so ask for the plan of each.

How many units are in Phase 1, and are they sold?

Phase 1 has 64 semi-detached and cluster units. EdgeProp and StarProperty reported it 80% sold at the April 2026 launch. We have not confirmed the current position, so ask what is available.

What are the building specifications?

The developer lists 3-phase 150 A power, high-speed fibre optic readiness and a ground floor built to a 15 kN/m2 load capacity. The press adds a 9 m ceiling, a column-free layout, EV isolator points and rainwater harvesting.

What security does the park have?

The developer lists a guarded industrial park with a licence plate recognition system, CCTV at the perimeter fencing, 24/7 guard patrolling and a visitor management system.

How far is KLIA?

The developer gives 14 km to KLIA and KLIA2 and 14 km to the KLIA Cargo Village, 4 km to the KLIA Transit Salak Tinggi station, 16 km to Nilai Inland Port, 46 km to KLCC and 59 km to Port Klang. Drive the routes at the hours you will use them.

Which highways connect it?

The developer lists six, with distances: Nilai-KLIA 1 km, Putrajaya-Cyberjaya 4 km, ELITE 8 km, KLIA Expressway 9 km, North-South Highway 12 km and the Maju Expressway 25 km.

Register interest

Get the price list and availability.

Tell us the layout and budget for ELEV8 Entrepreneurs' Park. Free, with no obligation.

Have a question first? See the FAQ ↑

WhatsApp Register