A 2-tower, 36-storey Transit-Oriented Development in Section 13, Shah Alam — the first of its kind there, linked to the upcoming LRT3 Shah Alam Line.
1 / 5
Developer
OSK Property
Property type
Serviced Apartment
Tenure
Leasehold (to 2120)
Status
Under construction
Completion
Expected Q2 2029
Bayu @ Mori Park is OSK Property's residential phase within Mori Park, a 3.41-acre masterplan the developer positions as the first Transit-Oriented Development in Section 13, Shah Alam. Two 36-storey towers hold the project's 1,028 units — 841 serviced apartments from Level 8 up, and 187 more compact flexi suites from Level 1 to Level 7 — sitting above a Level 1 lifestyle retail boulevard, so daily errands stay a lift ride away rather than a drive.
Connectivity is the whole premise of the site: it's built to link directly into the upcoming LRT3 Shah Alam Line, with the NKVE, Guthrie, Federal and Elite highways also reachable. Within the surrounding few kilometres sit Management & Science University (MSU) and its medical centre, Sri KDU International School, UOW KDU College's Glenmarie campus, and both Saujana and Glenmarie Golf & Country Clubs, alongside Shah Alam and Malawati Stadiums — an unusually dense mix of education, healthcare and recreation for one address.
Layouts favour flexibility over a single fixed formula: Type A is a compact 1+1 bedroom starter, Type B a straightforward 3-bedroom, and Type C a genuine dual-key configuration at 958 sq ft — one title, two separately accessible living spaces — aimed at owners who want to occupy part of the unit and rent the rest, or house extended family without losing privacy. Type D uses the same 958 sq ft footprint as a single 4-bedroom family layout instead.
| Type | Size | Layout | Gross Price (RM) |
|---|---|---|---|
| A | 550 sq ft | 1+1 bedrooms, 1 bathroom, 1–2 car park | 372,000 – 407,000 |
| B | 829 sq ft | 3 bedrooms, 2 bathrooms, balcony, 2 car park | 544,000 – 598,000 |
| C | 958 sq ft | 3 bedrooms, dual-key concept, balcony, 2–3 car park | 597,000 – 660,000 |
| D | 958 sq ft | 4 bedrooms, 2 bathrooms, balcony, 2–3 car park | 596,000 – 653,000 |
Pricing shown is gross, based on the developer's price list, and not independently re-verified — contact us via WhatsApp for the latest confirmed price list. A limited Bumi-lot allocation of Type A has been separately quoted at RM250,000 under the SAMM scheme, subject to eligibility. Maintenance is estimated at RM0.385 per sq ft plus a 10% sinking fund.
Bayu @ Mori Park sits in Section 13, Shah Alam, built to connect directly into the upcoming LRT3 Shah Alam Line, with the NKVE, Guthrie, Federal and Elite highways all reachable from the site. The immediate neighbourhood mixes education, healthcare and recreation: Management & Science University (MSU) and its medical centre, Sri KDU International School, UOW KDU College's Glenmarie campus, Utropolis Marketplace, and both Saujana and Glenmarie Golf & Country Clubs sit within a short drive, alongside Shah Alam and Malawati Stadiums and a Giant hypermarket.
Bayu @ Mori Park is developed by OSK Property, part of OSK Property Holdings Berhad, as a phase within its wider Mori Park masterplan in Section 13, Shah Alam. The development sits on a leasehold commercial title (with the serviced apartment component under HDA protection), with the lease expiring 11 March 2120.
Bayu @ Mori Park sits in Section 13, Shah Alam — billed as the first Transit-Oriented Development in that neighbourhood, linked to the upcoming LRT3 Shah Alam Line, with direct access to the NKVE, Guthrie, Federal and Elite highways.
Bayu @ Mori Park is developed by OSK Property, as a residential phase of its wider Mori Park masterplan in Section 13, Shah Alam.
550 sq ft (Type A, 1+1 bedrooms) up to 958 sq ft (Type C dual-key or Type D, 3-4 bedrooms), across 841 serviced apartments and 187 flexi suites in two 36-storey towers.
Gross pricing has been listed from RM372,000 for a 550 sq ft Type A unit up to RM660,000 for the 958 sq ft dual-key Type C, based on the developer's price list. Contact us via WhatsApp for current availability.
Expected completion is Q2 2029.
Bayu @ Mori Park sits on a leasehold commercial title (with the residential component under HDA protection), with the lease expiring 11 March 2120.
All four serviced apartment layouts at Bayu @ Mori Park.
Type A
Type B
Type C
Type D