About The Lighthauz
The Lighthauz is a freehold, 671-unit waterfront serviced apartment by EXSIM Waterfront Sdn Bhd, a collaborative development with Majestic Gen. It sits in Gelugor, within the broader Bandar George Town administrative area of Penang Island, directly beside Penang Bridge and facing the Penang Strait — named after the lighthouse as a symbol of guidance and coastal living. The project is GreenRE-certified, recognising EXSIM as an eco-responsible developer, and is registered as a Pangsapuri Perkhidmatan (serviced apartment) on commercial-titled land.
Access runs via the Tun Dr. Lim Chong Eu Expressway and Penang Bridge, with the proposed Penang Waterfront LRT Station (Mutiara LRT Line) planned nearby. The location places residents minutes from George Town's hospitals, colleges and shopping malls — including Gleneagles Medical Centre, Penang General Hospital, KDU Penang University and Komtar — while staying close to Bayan Lepas and the Penang Second Bridge for southbound connectivity.
The Lighthauz quick facts
- Developer: EXSIM
- Location: Gelugor, George Town · Penang
- Property type: High rise (Serviced apartment)
- Tenure: Freehold
- Total units: 671
- Status: Now open for booking
- Completion: September 2030
- Price: From RM890,435
- Est. monthly instalment: About RM3,550 a month for the lowest-priced unit (assumes a 90% loan over 35 years at 4% a year)
Key highlights
- Freehold, waterfront-facing, directly beside Penang Bridge with unobstructed sea views from most units
- 671 units across a single tower, with three unit types from 732 to 1,001 sq ft
- Resort-style facilities across four levels, including a Level 56 sky pool (Astral Lagoon) and Level 57 sky lounge (Horizon Lounge)
- GreenRE-certified — EXSIM recognised as an Eco-Responsible Developer
- Proposed Penang Waterfront LRT Station (Mutiara LRT Line) planned within the immediate vicinity
- Developed by EXSIM — GreenRE-certified, a 2-time FIABCI World Prix d'Excellence winner and an 8-time Malaysia Property Award (FIABCI-Malaysia) winner
Unit types & pricing
| Type | Size | Layout |
| Type A (A1 / A2) | 732 sq ft | 1 bedroom + 1 study, 2 bathrooms |
| Type B (B1 / B2) | 1,001 sq ft | 2 bedrooms + 1 study, 2 bathrooms |
| Type C (C1 / C2) | 1,001 sq ft | 2 bedrooms + 1 study, 2 bathrooms — alternate layout |
Gross price from RM 890,435 to RM 1,208,911, per EXSIM's official price list.
Facilities
The Lighthauz spreads its facilities across four levels. Level 1 opens with the Coastal Arrival drop-off and Horizon Lobby. Level 9 carries most of the communal lifestyle space — the Stargazing & Yoga Deck, Firelight Grillbar, Children Discovery Play, Coastal Fit outdoor gym, Seaside Court, Lumina Hall multipurpose hall and the indoor Coastal Gym. The two rooftop levels are reserved for sea-view leisure: Level 56's Astral Lagoon sky pool, Stargaze Soak jacuzzi and Mirage Bay wading pool, and Level 57's Fun Hub games room and Horizon Lounge.
Developer — EXSIM
EXSIM is a Malaysian property developer active across the Klang Valley, Johor Bahru and Penang. The Lighthauz stands beside its sister project Keeperz Suites in the same Gelugor waterfront precinct. Other current EXSIM projects indexed here include Causewayz Square @ JBCC.
Frequently asked questions
Does The Lighthauz have a virtual tour?
Yes. A 360° virtual tour of The Lighthauz is embedded on this page, hosted at 360vr.my/exsim/lighthauzkeeperz.
What is The Lighthauz?
The Lighthauz is a freehold, 671-unit waterfront serviced apartment by EXSIM in Gelugor, George Town, Penang, directly beside Penang Bridge and facing the Penang Strait, now open for booking.
Who is the developer of The Lighthauz?
The Lighthauz is developed by EXSIM Waterfront Sdn Bhd, a collaborative development with Majestic Gen.
Is The Lighthauz freehold or leasehold?
The Lighthauz is a freehold development, registered as a Pangsapuri Perkhidmatan (serviced apartment) on commercial-titled land.
What is the price of The Lighthauz?
Gross pricing runs from RM890,435 to RM1,208,911, per EXSIM's official price list, with expected completion in September 2030.